Skip to content

A better world, one project at a time.

We thrive on bringing our clients' visions to life by partnering with them to plan, design, engineer, and build their projects.

Contact us about your project

Sort By: | Showing 10 out of 69 items
Sort By: | Showing 10 out of 69 items

Wendel was selected to replace the chillers and upgrade the boiler plant at OGS's Harriman Campus. The scope implemented includes new chillers with a combined capacity of 10,000 tons, chiller plant optimization controls, a 600 BHP summer boiler, and new boiler controls.

The Iroquois Drive Reconstruction project provides safer access to the campus for the nearly 11,000 daily vehicular commuters including a full-depth pavement reconstruction, establishment of a pedestrian and bicycle multiuse path, stormwater treatment and improvements, and energy efficient street lighting.

Wendel was engaged by Columbia University Irvine Medical Center to investigate current energy & HVAC systems, utility infrastructure, and develop a Clean Energy Master Plan for their campus in Manhattan.

This project studied several options for the Lawrence Downtown Transfer Center which included renewed traffic pattens, canopied bus boarding, bus shelters, a driver amenity facility as well as bicycle accommodations. The project focused on the layout and cost analysis of several concept design options for the Transfer Center.

The M&T Tech Hub is an incredibly inspiring space for talented, creative, innovative technologists to come together to share ideas and solve problems.

The NFTA retained Wendel to provide professional engineering services to replace the existing roof-mounted central air-cooled chiller at the Metropolitan Transportation Center (MTC).