Skip to content

A better world, one project at a time.

We thrive on bringing our clients' visions to life by partnering with them to plan, design, engineer, and build their projects.

Contact us about your project

Sort By: | Showing 10 out of 89 items
Sort By: | Showing 10 out of 89 items

Wendel was selected to replace the chillers and upgrade the boiler plant at OGS's Harriman Campus. The scope implemented includes new chillers with a combined capacity of 10,000 tons, chiller plant optimization controls, a 600 BHP summer boiler, and new boiler controls.

The Iroquois Drive Reconstruction project provides safer access to the campus for the nearly 11,000 daily vehicular commuters including a full-depth pavement reconstruction, establishment of a multiuse path, stormwater treatment and improvements, energy efficient street lighting, and landscape enhancements.

Wendel was engaged by Columbia University Irving Medical Center to investigate current energy & HVAC systems, utility infrastructure, and develop a Clean Energy Master Plan for their campus in Manhattan.

Wendel's Five Bugles Design team has led the client through design and, ultimately, construction with our Master Builder® approach. This two-story facility located adjacent to the University of Wisconsin La Crosse replaces the existing fire station with a state-of-the-art facility that will also provide much-needed room for administration as well as everyday response.

Wendel’s Five Bugles Design team provided design and construction management services for this 20,743 square foot four-bay fire station.

This project studied several options for the Lawrence Downtown Transfer Center which included renewed traffic pattens, canopied bus boarding, bus shelters, a driver amenity facility as well as bicycle accommodations. The project focused on the layout and cost analysis of several concept design options for the Transfer Center.